Connections - useful documents
-
Application for new connections or load increases to serve an industrial and commercial development
- Type:
- Date:
- 28/01/2022
- Size:
- 713.9 KB
-
Application for a Point of Connection to serve an embedded network (IDNO)
- Type:
- Date:
- 29/03/2022
- Size:
- 983.5 KB
-
Application for a Point of Connection to serve new network to be adopted by us (ICP)
- Type:
- Date:
- 29/03/2022
- Size:
- 1 MB
-
-
-
Application for unmetered connections services (new connections, transfers and disconnections)
- Type:
- Date:
- 29/03/2022
- Size:
- 955.9 KB
-
Application to divert our existing overhead lines, underground cables or substation equipment
- Type:
- Date:
- 29/03/2022
- Size:
- 957.4 KB
-
-
-
-
-
-
Connections Meetings Leaflet - how to request a connections surgery appointment
- Type:
- Date:
- 13/05/2022
- Size:
- 366.8 KB
-
-
-
-
-
Distribution System Access for Embedded Generation Scotland - Rev 3.0
- Type:
- Date:
- 28/01/2022
- Size:
- 395.8 KB
-
-
-
-
-
-
-
Letter from Mark Mathieson, Managing Director Networks, regarding replacement of the mainland to Jura subsea cable
- Type:
- Date:
- 28/01/2022
- Size:
- 16.7 KB
-
-
-
-
-
-
-
PR-NET-CAB-009 - Procedure For The Removal And Replacement of Company Cut-Out Seals By Electrical Contractors
- Type:
- Date:
- 28/01/2022
- Size:
- 293.4 KB
-
Scottish Hydro Electric Power Distribution Long Term Development Statement_Geographic Map_1 of 4
- Type:
- Date:
- 29/11/2022
- Size:
- 13.6 MB
-
Scottish Hydro Electric Power Distribution Long Term Development Statement_Geographic Map_2 of 4
- Type:
- Date:
- 29/11/2022
- Size:
- 16.1 MB
-
Scottish Hydro Electric Power Distribution Long Term Development Statement_Geographic Map_3 of 4
- Type:
- Date:
- 29/11/2022
- Size:
- 12.3 MB
-
Scottish Hydro Electric Power Distribution Long Term Development Statement_Geographic Map_4 of 4
- Type:
- Date:
- 29/11/2022
- Size:
- 3.4 MB
-
Scottish Hydro Electric Power Distribution Long Term Development Statement_Part 1_Nov 2022
- Type:
- Date:
- 29/11/2022
- Size:
- 691.6 KB
-
-
-
-
-
-
-
SHEPD Long term Development Statement_Geographic Map1_33kV Network
- Type:
- Date:
- 29/01/2022
- Size:
- 16.3 MB
-
SHEPD Long term Development Statement_Geographic Map2_Aberdeen
- Type:
- Date:
- 28/01/2022
- Size:
- 13.3 MB
-
SHEPD Long term Development Statement_Geographic Map3_Dundee
- Type:
- Date:
- 28/01/2022
- Size:
- 9.3 MB
-
SHEPD Long term Development Statement_Geographic Map4_Shetland Islands
- Type:
- Date:
- 28/01/2022
- Size:
- 3.3 MB
-
-
-
-
-
Southern Electric Power Distribution Long Term Development Statement Part 1
- Type:
- Date:
- 30/11/2022
- Size:
- 169 KB
-
SSEN Connections - Competition in Connections Information Pack
- Type:
- Date:
- 19/05/2022
- Size:
- 680 KB
-
-
SSEN Connections - Introductory Stakeholder Information Pack
- Type:
- Date:
- 19/05/2022
- Size:
- 1.1 MB
-
SSEN Connections - Introductory Stakeholder Information Pack
- Type:
- Date:
- 19/05/2022
- Size:
- 1.1 MB
-
SSEN Network Adoption Process Flowchart (Metered Connections)
- Type:
- Date:
- 28/01/2022
- Size:
- 421.3 KB
-
TEM-NET-COM-008 DNO_IDNO Template HV or EHV BCA SEPD Sep 2017 (v1_01)
- Type:
- Date:
- 28/01/2022
- Size:
- 482.4 KB
-
-
TEM-NET-COM-012 DNO_IDNO Template HV or EHV BCA SHEPD Sep 2017 (v1_01)
- Type:
- Date:
- 28/01/2022
- Size:
- 481 KB
-
-
TEM-NET-COM-014_Adoption Agreement (Metered Connection) (Rev1.02)
- Type:
- Date:
- 28/01/2022
- Size:
- 607.9 KB
-
-
TEM-NET-COM-016_SHEPD - Network Access Agreement (Rev1.01)
- Type:
- Date:
- 28/01/2022
- Size:
- 531.4 KB
-
-
-
-
-
-