Your installer is required to send the following information on your behalf:

Installation Commissioning Confirmation Form, including:

• Meter point administration number (MPAN)
• Total capacity of generation installed (kW)

Inverter Type Test Certificate including:

• The power rating (kW) on the certificate should match the power rating (kW) of the inverter shown on the schematic diagram

Schematic drawing, which should show the following:

• The generator itself
• Name and power rating (kW) of the inverter being used
• Live phases, neutral, earth
• Lockable isolators
• Clear demarcation between our and your equipment

How to apply

To notify us of your generation equipment being installed, we require the following information: 

Once completed please apply by emailing us by using one of the email addresses below that are applicable to you and attach the documentation. This information should be submitted within 28 days of installation. 

In Scotland: Notifications.northmicrogen@sse.com

In England: Notifications.southmicrogen@sse.com 

Note to installers: Please forward our confirmation email to the homeowner, as they will require this to apply for Smart Export Guarantee.

Frequently asked questions

Do you know you have a choice?

If you are looking to connect a site dedicated to generation, we can provide estimates and quotations for new or existing connections. If you wish, you can seek alternative estimates or quotations from Independent Connections Providers (ICPs). When you receive a quotation for the connection, it will be split into contestable and non-contestable elements.  This is done to be as clear as possible to what element a third party can offer.  For further information on what an ICP can offer, follow the link below.