Your installer is required to send the following information on your behalf:
Installation Commissioning Confirmation Form, including:
• Meter point administration number (MPAN)
• Total capacity of generation installed (kW)
Inverter Type Test Certificate including:
• The power rating (kW) on the certificate should match the power rating (kW) of the inverter shown on the schematic diagram
Schematic drawing, which should show the following:
• The generator itself
• Name and power rating (kW) of the inverter being used
• Live phases, neutral, earth
• Lockable isolators
• Clear demarcation between our and your equipment
How to apply
To notify us of your generation equipment being installed, we require the following information:
- Download and complete the G98 - Form B
- Inverter type test certificate
- Schematic drawings
Once completed please apply by emailing us by using one of the email addresses below that are applicable to you and attach the documentation. This information should be submitted within 28 days of installation.
In Scotland: Notifications.northmicrogen@sse.com
In England: Notifications.southmicrogen@sse.com
Note to installers: Please forward our confirmation email to the homeowner, as they will require this to apply for Smart Export Guarantee.